crsc

Project Contracting

Your current location: Home Our Business Project Contracting
Date:2010-9-11Visits:481

CRSC provides EPC and FEPC services for the customer, perfect system solution, quick producing and transportation, highly qualified project management, professional installation, test and commissioning work, full-scale training and complete after-sale services are highlighted in all projects CRSC has ever done.

 

Passenger Dedicated Railway Line Project
With mostly its own technology and products, CRSC contracted the signal, communication, power supply and SCADA integrated system for the passenger dedicated railway line projects, such as:
Beijing-Tianjin Line: 116.9 km,5 stations at the operational speed of 300km/h
Wuhan-Guangzhou Line: 989 km,12 stations at the designed speed of 350km/h
Hefei-Wuhan Line: 351 km,6 stations at the designed speed of 200km/h

 

Qinghai-Tibet Railway Project
In this project, CRSC completed the project survey, installation, commissioning and the site test of all supplied systems under the extreme weather conditions. CRSC took the responsibility the centralized traffic control system, part of signal system and the video monitoring system. Through the CTC system, the Qinghai-tibet railway is realized the full-line computerized control and facilitated operation. The video monitoring system is designed an automatic monitoring function to identify the people near the dangerous places and give warnings.

 

Speed Increase Projects for Existing National Railways
CRSC participated into all six times of the speed increasing projects in Chinese railways, and the total length of the participated railways is over 50,000 kilometers; the latest projects enabled the train to operate at 250km/h, and CRSC’s CTCS-II level systems and relative technology are adopted all over China. From the design, supply to the installation and commissioning of the signal and communication system rehabilitation projects, CRSC always
leads the way forward to the target on the fast, accurate and comfortable train operation.

 

Dalian Light Rail Transit Project
This project is a milestone in Chinese urban transit construction history, for each equipment of the system is a hundred percent domestically produced with independent intellectual properties. CRSC, as the main contractor of signal and communication system, successfully completed this EPC project.

 

Tehran Metro Line 1&2 Project
The total length of Tehran Metro Line 1&2 is 46.3 km with 42 station, 2 depots and 2 yards. The full line has been put into the revenue operation at the March 2008.